![]() ![]() Wayne field/park for a new, bigger detention system. inappropriate stormwater management and development in the township), the Commissioners have been considering a variety of proposals that would utilize almost the entire N. ![]() In response, rather than propose repairing the basin and addressing the root cause of flooding in North Wayne (i.e. While there exists a small basin on a portion of the property, disrepair has prevented it from functioning as needed. ![]() Since at least 2014, Radnor Township has been proposing to construction a new detention basin in North Wayne Park, Radnor Township, PA as a solution to downstream flooding. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |